Initial Training Checklist — Cleaning

TRA_FOR_01.4

Initial cleaning induction training checklist. Completed by the manager / trainer; once submitted, this record is sent to HR.

Part A — Details
Part B — Training Topics

Mark each topic Yes, No or N/A.

TopicYesNoN/A
Compliance
Initial presentation and share contact details
Cleaning and storage room(s)
Iconic policies and procedures
Emergency & Preparedness
Fire emergency and site orientation
Emergency contacts and numbers
Chemical spill clean up
Biohazard spill clean up
Syringes and sharp objects clean up
Incident / injury response
Health & Safety
Common risks of the job
Personal Protective Equipment (PPE)
Incident and hazard reporting (all incidents, hazards and near misses to be reported)
Introduction to the Safe / Standard Operating Procedures
Manual handling
Working at heights (extension pole)
Chemical Handling & Storage
Review SDS and Hazardous Chemical Register
Explain risk of chemical handling (fumes/vapours, fire, injury, spills)
Explain control measures (spill kits, bunding, PPE)
Safe dilution of chemicals
All chemicals labelled; do not mix; follow SDS
Chemical storage and disposal
Containers not corroded, broken, rusted or leaking
Environment
Waste disposal
Site environment requirements
Storage of Materials & Equipment
Return all equipment to the allocated storage area
Rinse out all cloths, buckets and clean all equipment
Store colour-coded equipment separately
Always leave trolleys stocked and clean for the next cleaner
General Cleaning
Vacuuming (isolate damaged equipment; inspection)
Dusting
Mopping
Wiping
Graffiti removal
Detail cleaning
Rubbish collection
Toilet cleaning (refill consumables, cleaning-in-progress signage)
Sanitising
Specific Cleaning
Office cleaning
External cleaning
Glass cleaning (squeegee usage)
Kitchen cleaning (incl. appliances)
Mall patrol (incl. toilet cleaning)
Food court
Cobwebbing (PPE, signage, isolate area, extension pole)
Window cleaning (PPE, signage, squeegee, extension pole — working at height)
Scrubber operation (PPE, isolate, pre/post checks)
Buffer operation (PPE, isolate, pre/post checks)
Pressure washer operation (PPE, isolate, pre/post checks)
Blower operation (PPE, isolate, pre/post checks)
Acknowledgment

Sign in each box using a mouse or finger. Your drawn signature is accepted as your electronic signature.

Submitted by

Identify yourself so HR knows who submitted this record.

© Iconic Services Pty Ltd · Manager Portal